Big data analytics and data visualization to construction problems
Geographic Information System (GIS) applications to advanced project decision making
Advanced technologies in construction
Construction cost and schedule estimation
Construction market trend analysis
Construction safety
Education
Ph.D., Civil Engineering, Iowa State University, 2016 M.S., Civil and Environmental Engineering, University of Nevada Las Vegas, 2013 B.E., Civil Engineering, Tribhuvan University, 2010
Honors and Awards
CBAT Faculty Excellence Award for Research, 2023
Associated Schools of Construction (ASC) Proceedings Best Paper Award, 2019
One of the most popular authors in the Data Storage Systems Commons (BePress), December
2017
Travel Scholarship, Transportation Student Association, Iowa State University, 2015
GPSS Travel Professional Advancement Grant, Iowa State University, 2014
Tau Beta Pi – The Engineering Honor Society, 2014
GPSA Book Scholarship – University of Nevada Las Vegas, 2012
UNLV Access Grant – University of Nevada, Las Vegas, 2011
The College Fellowship Scholarship – Pulchowk Campus, 2005-2010
Freeship – Pulchowk Campus, 2009
Teaching
Dr. Shrestha has taught various civil and construction engineering related courses
at multiple institutes. These include:
ENTC 2410 Construction Fundamentals
ENTC 3410 Construction Estimating and Planning
ENTC 3420 Advanced Construction Estimating and Planning
ENTC 4060 Project Scheduling
ENTC 4417 Construction Financing and Administration
ENTC 5900 Independent Study
ENTC 5960 Thesis
CONE 322 Construction Equipment and Heavy Construction Methods
CONE 381/481 Bidding Construction Projects
CE 503 Construction Management Function and Processes
Publications
Peer-Reviewed Journal Papers
Le, C., Shrestha, K.J., Jeong, H.D., Damnjanovic, Ivan (2021). “A Sequential Patter
Mining Driven Framework for Developing Construction Logic Knowledge Bases.” Elsevier Automation in Construction. 121, 103439, https://doi.org/10.1016/j.autcon.2020.103439.
Abdelaty, A., Shrestha, K. J., & Jeong, H. D. (2020). “Estimating Preconstruction
Services for Bridge Design Projects.” ASCE Journal of Management in Engineering, 36(4), 04020034. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000793.
Kisi, K.P., Shrestha, K.J., and Kayastha, R. (2020), “Labor Shortage and Safety Issues
in Post-Earthquake Building Construction: A Case Study.” ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(3), 05020011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000386.
Shrestha, K. J., and Jeong, H. D. (2017) “Computational Algorithm to Automate As-Built
Schedule Development Using Digital Daily Work Reports.” Elsevier Automation in Construction, 84, 315–322. https://doi.org/10.1016/j.autcon.2017.09.008.
Shrestha, K. J., Jeong, H. D., and Gransberg, D. D. (2017) “Multidimensional Highway
Construction Cost Indexes Using Dynamic Item Basket.” ASCE Journal of Construction Engineering and Management, 143(8), https://doi.org/10.1061/(ASCE)CO.1943-7862.0001307.
Shrestha, P. P. and Shrestha, K. J. (2017) “Factors Associated with Crash Severities
in Built-up Areas along Rural Highways of Nevada: A Case Study of 11 Towns.” Elsevier Journal of Traffic and Transportation Engineering, Special Issue: Driver Behavior, Highway Capacity and Transportation Resilience, 4(1).
https://doi.org/10.1016/j.jtte.2016.08.003.
Shrestha, K. J., and Shrestha, P. P. (2016) “Comprehensive Framework for Speed-Zone
Guidelines.” Elsevier Journal of Traffic and Transportation Engineering, 3(4), 352–363. https://doi.org/10.1016/j.jtte.2015.09.008.
Peer-Reviewed Conference Papers
Shrestha, K.J., Canon, J., Abdelaty, A. and Kisi, K., “Common Building Construction
Code Violations: Case Study of Johnson City, Tennessee”, CI CRC Joint Conference,
March 20 – March 23, 2024
Jamal, M.S, Abdelaty, A., Shrestha, K.J., “Improving the Reliability of Adverse Weather
Day Estimation in Project Planning: A Framework Utilizing Daily Work Reports”, CI
CRC Joint Conference, March 20 – March 23, 2024
Shrestha, K. J., Uddin, M.M., Fielden, J., “Comparison of State Department of Transportation
Practices in Analyzing Risks for Large Infrastructure Projects”, 59th Annual Associated
Schools of Construction International Conference, Liverpool John Moore University
(LJMU), Liverpool, England, April 3 – April 5, 2023.
Shrestha, K.J., Adebiyi, J., Uddin, M., and Sturgill, R. (2022). “Framework to Compute
Emission Costs Associated with Work Zones.” The 9th International Conference on Construction
Engineering and Project Management (ICCEPM) 2022, Las Vegas, June 20 – 23, 2022.
Shrestha, K.J., Mani, N., Kisi, K., and Abdelaty, A. (2022). “Social Media Analytics
to Understand the Construction Industry Sentiments.” The 9th International Conference
on Construction Engineering and Project Management (ICCEPM) 2022, Las Vegas, June
20 – 23, 2022.
Hussan, F.U., Le, T., Le ,C., and Shrestha, K.J. (2022). “Automated Prioritization
of Construction Project Requirements using Machine Learning and Fuzzy Logic System.”
The 9th International Conference on Construction Engineering and Project Management
(ICCEPM) 2022, Las Vegas, June 20 – 23, 2022.
Jamal, M.S, Abdelaty, A., and Shrestha, K.J. (2022). “Factors Affecting Delay on Public
Transportation Projects in Short Construction Seasons.” The 9th International Conference
on Construction Engineering and Project Management (ICCEPM) 2022, Las Vegas, June
20 – 23, 2022.
Shrestha, K.J., Uddin, M., and Adebiyi, J. (2021), “Current Practices of Calculating
and Utilizing Road User Costs in the U.S,” Canadian Society for Civil Engineers (CSCE)
2021 Annual Conference, May 26-29, 2021.
Kisi, K.P., Kayastha, R., Pradhananga, N., Shrestha, K. J. and Khoteja, D., “Factors
Contributing Building Reconstruction and Renovation Challenges: A Case Study After
April 2015 Gorkha Earthquake,” Construction Research Congress (CRC) 2020, Virtual
Conference.
Shrestha, K.J., Le, C., Jeong, H.D., Le, T. (2019), “Mining Daily Work Report Data
for Detecting Patterns of Construction Sequences.” Creative Construction Conference,
June 29 – July 2, 2019, Budapest, Hungary.
Kisi, K.P, Mani, N., Lee, N. Shrestha, K.J., Shrestha, K., and Kayastha, R. (2019),
“Opportunities and Challenges for Module Construction in Developing Nations: A Case
Study in the Nepalese Construction Industry.” 7th Canadian Society for Civil Engineers
(CSCE) Annual Conference, June 12-15, 2019, Lawal, Greater Montreal, Quebec, Canada.
Shrestha, K.J. and Jeong, H.D. (2019). “Automated Unit Price Visualization Using ArcPy
Site Package in ArcGIS.” 36th International Symposium on Automation and Robotics in
Construction (ISARC) 2019, May 21-24, 2019, Banff, Alberta, Canada.
Abdelaty, A. and Shrestha, K.J. (2019). “Current Practices of Experiential Learning
in the United States Construction and Technology Programs.” Interdependence Between
Structural Engineering and Construction Management, May 20-25, 2019, Chicago, IL.
Shrestha, K.J. and Osborne, D.L. (2019). “An Exploratory Look at Thefts from Construction
Sites.” 55th Annual Associated Schools of Construction (ASC) International Conference,
April 10-13, 2019, Denver, Colorado. (The Best Conference Proceeding of the Year).
Mitra, J.P., Shrestha, K.J., Ross, J., and Hong, J. (2019). “Analysis of Construction
Cost Variation of Construction Manager General Contractor (CM/GC) Project.” 55th Annual
Associated Schools of Construction (ASC) International Conference, April 10-13, 2019,
Denver, Colorado.
Shrestha, K. J., Jeong, H. D., and Gransberg, D. D. (2016). “Critical Analysis of
Current Practices of Highway Construction Cost Index (HCCI) Calculation and Utilization.”2016
Construction Research Congress. San Juan, Puerto Rico.
Shrestha, K. J., Jeong, H. D., and Gransberg, D. D. (2015). “Current Practices of
Collecting and Utilizing Daily Work Report Data and Areas for Improvements.” The 6th
International Conference on Construction Engineering and Project Management (ICCEPM
2015). October 11-13, 2015, Busan, Korea.
Jain, D., Shrestha, K. J., and Jeong, H. D. (2015). “Spatiotemporal Analysis of Unit
Prices of a Major Cost Item for Transportation Projects across Iowa Using Geographic
Information Systems (GIS).” The 6th International Conference on Construction Engineering
and Project Management (ICCEPM 2015). October 11-13, 2015, Busan, Korea.
Shrestha, K. P., and Shrestha, P. (2015). “Framework Development of Speed Zone Guidelines
based on Current Best Practices.” Transportation Research Board: 93rd AnnualMeeting, Transportation Research Board, January 12-16, 2015, Washington, D.C.
Shrestha, P. P., Shrestha, K., and Shrestha, K. (2012). “Carbon Dioxide Emissions
by the Transportation Sector in Kathmandu Valley, Nepal.” Developing the Frontier of Sustainable Design, Engineering, and Construction, American Society of Civil Engineers, November 7-9, 2012, Fort Worth, Texas, 90–97.
Presentations
Adebiyi, J., Shrestha, K. J., Uddin, M.M., “Balancing the Ease and Accuracy of Road
User Cost (RUC) Computation for Use in Alternative Contracting Procedure,” 150th Anniversary
of the Department of Civil, Construction, and Environmental Engineering, Iowa State
University (Poster Presentation), September 17, 2021.
Adebiyi, J.A., Shrestha, K.J., Uddin, M.M., “An Enhanced Framework to Compute Road
User Costs,” 14th American Society of Nepalese Engineers (ASNEngr) Annual Conference
2021.
Adebiyi, J.A., Shrestha, K.J., Uddin, M.M., “Identification of the Best Practices
to Compute Road Users Costs,” Tennessee Department of Transportation (TDOT) Innovation
to Implementation Forum 2021, March 31, 2021.
Adebiyi, J.A., Shrestha, K.J., Uddin, M.M., “Identification of the Best Practices
to Compute Road Users Costs (RUCs),” 8th Annual Appalachian Research in Business Symposium,
Eastern Kentucky University, March 26, 2021.
Shrestha, K.J. and Jeong, H.D., “Multidimensional Highway Construction Cost Indexes
Using Dynamic Item Basket for South Dakota Department of Transportation,” 13th American
Society of Nepalese Engineers (ASNEngr) Annual Conference 2020.
Shrestha, K.J., Uddin, M. M., Adebiyi, J.A., Kawsar, F.A., “Road User Cost as an Integral
Component of the Project Cost Estimating Process for A+B Contracting.” Transportation
Estimators’ Association (TEA) Conference 2020.
Shrestha. K.J. and Jeong, H.D., “Modern Unit Price Visualization and Estimating Tool
for Highway Agencies,” 2020 SAVE International Value Summit, Virtual Conference.
Shrestha, K.J. “Development of a Fully Automated Unit Price Visualization and Estimating
Framework and Tool Using ArcObjects .NET SDK.” 2020 Transportation Research Record
(TRB) Annual Meeting, Washington, D.C.
Shrestha, K.J. “GIS Based Unit Price Visualization and Estimation”, 61st International
Highway Engineering Exchange Program (IHEEP) Conference 2019 - Transportation Technology
on Tap, September 8 – 12, Asheville, NC.
Shrestha, K.J. and Jeong, H.D. (2018). “Automated Spatial Visualization of Bid Data
Using Geographic Information System.” American Society of Civil Engineers (ASCE) Construction
Institute (CI) Summit 2018. Fort Worth, Texas. (Invited).
Shrestha, K. J., and Jeong, H.D. (2017). “HCCI Tool Research Project”, Transportation
Estimators Association – Project Users Group (TEA-PUG) 2017 Conference. September
19-27, 2017. Kalispell, Montana. (Invited).
Shrestha, K. J., and Jeong, H. D. (2015). “Enhanced Framework for Better Collection
and Utilization of Daily Work Report Data.” 2015 Mid-Continent Transportation Research
Symposium. Iowa State University, Ames, Iowa.
Jeong, D. H., and Shrestha, K. J. (2015). “As-Built Schedule Development based on
Daily Work Report Data.” US-Korea Conference 2015. Atlanta, GA. (Invited).
Shrestha, K. J., and Jeong, H. D. (2014). “Using Web Scraping Technology to Automatize
Cost Data Collection for Calculating Construction Cost Indexes.” 1st Graduate and
Professional Student Research Conference, Iowa State University, Ames, Iowa.
Jain, D., Shrestha, J., and Jeong, D. (2014). “Spatiotemporal Visualization of Major
Cost Items in Highway Construction in Iowa.” Civil and Construction Software Club
Technology Fair. Iowa State University, Ames, Iowa. (Invited).
Shrestha, K. J., and Jeong, H. D. (2014). “DWR Based As-Built Schedule –Powerful but
Highly Neglected Application of DWR Data.” CCEE Graduate Student Research Showcase
and Poster Competition. Iowa State University, Ames, Iowa.
Shrestha, K. P., and Jeong, D. (2013). “Big Data, Predictive Analytics, and Data Visualization
in Construction Engineering.” CCEE Graduate Student Research Showcase and Poster Competition.
Iowa State University, Ames, Iowa.
Shrestha, K. P., and Shrestha, P. (2013). “Investigation of Crashes and Identifying
the Best Practices for Setting up Speed Zones in Towns Along Rural Highways in Nevada.”
College of Engineering: Graduate Celebration, University of Nevada, Las Vegas, Las
Vegas, Nevada.
Technical Reports
Shrestha, K.J., Uddin, M., and Adebiyi, J. (2021). “Calculating Road User Cost for
Specific Sections of Highway for Use in Alternative Contracting Project.” Tennessee
Department of Transportation, September 2021.
Jeong, H. D., Gransberg, D. D., and Shrestha, K. J. (2017). “Advanced Methodology
to Determine Highway Construction Cost Index (HCCI).” Final Report, Montana Department
of Transportation.
Gransberg, D. D., Jeong, H. D., Craigie, E., Rueda, J., and Shrestha, J. (2015). “Preconstruction
Services Cost Estimating Guidebook.” Federal Highway Administration, Washington, D.C.
Jeong, H. D., Gransberg, D. D., and Shrestha, K. J. (2015). “Framework for Advanced
Daily Work Report System.” Mid-America Transportation Center.
Shrestha, P. P., Said, A., Tian, Y., and Shrestha, K. P. (2013). “Guidelines for Speed
Reduction in Towns along Rural Highways.” Nevada Department of Transportation.
Funded Research Projects
Research Funding (PI)
PI, “RFP#8 Evaluation and Development of Cost Prediction Models for Resurfacing Projects
to Improve M&R Analysis and Project Development,” Submitted to the Tennessee Department
of Transportation. Investigators: Shrestha, K.J., Uddin, M.M., February 2023, Requested
Funding Amount: $200,000.
PI, “Risk Assessment Tool Associated with Cost,” Funded by Tennessee Department of
Transportation. Investigators: Shrestha, K.J. and Uddin, M., 2022 - 2023, Funding
Amount: $150,000.
PI, “Calculating Road User Cost for Specific Sections of Highway for Use in Alternative
Contracting Projects,” Funded by Tennessee Department of Transportation. Investigators:
Shrestha, K.J., Uddin, M., and Kawsar, F., 2019 - 2021, Funding Amount: $98,995.75.
PI, “Data Collection and Preliminary Analysis to Develop a Methodology to Compare
Construction Inflation Rates in Multiple States,” Funded by Research Development Committee,
East Tennessee State University. Investigator: Shrestha, K.J., 2018, Funding Amount:
$9,458.00.
PI, “MDT Unit Price Visualization Using Geographical Information System,” Funded by
Montana Department of Transportation. Investigator: Shrestha, K.J., 2017, Funding
Amount: $27,652.73.
Research Projects (Researcher)
IaDOT (2016), “Bridge Design Effort and Cost Estimation Models – Phase I,” Iowa Department
of Transportation, Research project value: $50,000.
MDT: 8232-001 (2015-2016), “Advanced Methodology for Highway Construction Cost Index,”
Montana Department of Transportation, Research project value: $152,463.
MATC-ISU: 238 (2013 – 2015), “Framework for Advanced Daily Work Report System,” Mid-America
Transportation Center, Research project value: $55,793.
P255-11-803 (2012-2013), “Preparing Guidelines for Speed Reduction in Towns along
Rural Highways,” Nevada Department of Transportation, Research project value: $106,261.
NCHRP 15-51 (2013-2015), “Pre-construction Services Cost Estimating Guidebook,” National
Corporative Highway Research Program, $425,000 – developed top-down cost estimation
models to estimate preconstruction costs.
MDT: 8227-001 (2015-2016), “Top-down Construction Cost Estimating Model/Guide Using
a Neural Network within an Off-the-Shelf Spreadsheet and Database Program,” Montana
Department of Transportation, $131,955 – performed initial data extraction and exploration
for detailed analysis.
Solar Decathlon (2013), U.S. Department of Energy, $200,000 – developed cost estimation
template for the DesertSol house.